Sajesan Ghimire

Why Nepal needs a coordinated hydro-solar-storage strategy rather than a hydro-versus-solar debate

Hydropower should remain the backbone of Nepal’s power system. Solar should serve productive daytime demand, while flexible hydropower, storage, transmission and demand management balance the system.

CORE ARGUMENT

Hydropower should remain the backbone of Nepal’s power system. Solar should serve productive daytime demand, while flexible hydropower, storage, transmission and demand management balance the system.


Nepal’s electricity sector has entered a new phase. The country can export electricity during periods of surplus, yet it can still require imports when river flows fall and domestic generation weakens. This is not a contradiction; it is a timing problem. Nepal’s next energy challenge is no longer only how many megawatts it can build, but whether electricity is available in the right season, at the right hour and near the right load centre.

The paradox: a net exporter that still imports

In FY 2024/25, Nepal exported about 2,380 GWh of electricity and imported 1,681 GWh, producing a net export balance of 699 GWh. At the end of the same fiscal year, installed generation capacity stood at 3,591 MW. Maximum national demand reached 2,409 MW, while maximum system demand, including exports, reached 2,901 MW. [1]

Those figures show progress, but they do not mean that every installed megawatt is available in every month. Much of Nepal’s hydropower capacity is run-of-river and therefore closely linked to seasonal water flows. Output is generally stronger during the monsoon and lower during the dry winter period. Annual energy surplus and dry-season tightness can therefore exist in the same system.

Figure 1. Nepal’s annual electricity-trade balance in FY 2024/25.

Source: Nepal Electricity Authority, Annual Report 2024/2025 [1].

Solar is not a rival to hydropower

The strongest case for solar in Nepal is complementarity. Solar produces during the day, when factories, hotels, hospitals, schools, cold stores, irrigation pumps, offices and many EV charging facilities are operating. It can be installed in modular sizes, developed faster than most large generation projects and located closer to electricity users.

A Nepal-focused study by the Alternative Energy Promotion Centre and GIZ highlights the seasonal complementarity between solar PV and hydropower and recommends coordinated planning of solar, pondage, storage hydropower and demand-side measures. [2]

For commercial and industrial users, the best project is not automatically the largest array that can fit on a roof. The best project is the one that follows the facility’s actual load profile. Hourly demand, operating shifts, weekends, transformer limits, future expansion and the expected level of self-consumption should determine system size.

Solar supplies the day; flexibility balances the system

Solar alone cannot meet evening demand or solve every grid problem. Nepal will still need reservoir and peaking hydropower, battery storage, stronger transmission, better forecasting, time-of-use tariffs, demand response and regional electricity trade. The value of solar increases when these resources are developed together.

The operational logic is simple: use sunlight for productive daytime loads and preserve flexible water or stored energy for higher-value hours. Where hydropower has pondage or storage, daytime solar can reduce the need to release water for ordinary midday demand. Batteries can shift a limited share of solar energy into the evening and support critical loads or constrained substations.

Figure 2. Installed capacity and peak demand are not the same as continuously available energy.

Source: Nepal Electricity Authority, Annual Report 2024/2025 [1].

The market signal is already strong

NEA’s competitive process selected 63 solar projects with a combined capacity of 960 MW. NEA reported that PPAs for 170 MW had been signed by the end of FY 2024/25; public reporting in February 2026 stated that PPAs covering about 750 MW had subsequently been completed. [1, 5]

This means the key challenge is shifting from investor interest to execution. Projects must still secure land, approvals, grid connection, financing, equipment, construction capacity and reliable operation. Nepal should measure success by commissioned megawatts, actual generation and grid value—not only by tender awards or signed documents.

What Nepal should do nextt matters

1

Accelerate C&I rooftop and self-consumption

Prioritise well-engineered systems for consumers with strong daytime loads.

2

Build utility solar near substations and load centres

Select locations according to grid value, not tariff alone.

3

Launch targeted storage pilots

Use batteries where they solve a defined problem such as evening peaks, diesel reduction or substation constraints.

4

Encourage productive daytime demand

Use time-of-use tariffs to support industrial processes, pumping, cooling and scheduled EV charging.

5

Create stable commercial and grid rules

Clarify PPA conditions, connection responsibilities, curtailment, land requirements and self-generation rules.


Conclusion

Hydropower built Nepal’s electricity system and will remain its backbone. But the next stage of energy development requires a more diversified and flexible system. Solar can serve Nepal’s daytime economy, reduce pressure on hydropower during working hours and support domestic electrification. Flexible hydropower, storage, transmission and demand management must complete the system.

Nepal does not need a hydro-versus-solar debate. It needs a hydro-solar-storage strategy.


References

[1] Nepal Electricity Authority. (2025). Annual Report 2024/2025.

[2] Alternative Energy Promotion Centre & GIZ. (2024). Complementing Hydropower with Utility-Scale Solar Electricity in Nepal.

[3] Government of Nepal. (2025). Nationally Determined Contribution 3.0.

[4] International Energy Agency. (2025). Renewables 2025: Renewable Electricity.

[5] Republica. (2026, February 3). NEA signs PPAs for 750 MW of solar power.